Hamilton City Council installed a permanent onsite standby generator to run two 150kW Pumps at the Pukete Water Reservoir. One Electrical was contracted to carry out the electrical installation.
The scope of the project
- Wire power cabling between generator and Main Control Cabinet (MCC) including cable support systems
- Wire automatic changeover controls between mains and generator supply.
- Wire generator status feedback to PLC
- System commissioning