One Electrical was awarded the Electrical and Control Systems component for the South Waikato District Council Wastewater Treatment Plant Digestor Upgrade.This involved new:
- Sludge Blending Tank
- Flock Reactor Tanks
- SludgeThickeners
- Thickened Sludge Tank
- Digestor
- Centrifuge Feed Tank and
- Centrifuge
- Boiler House
- ChemicalStorage and
- Dosing Systems
- Biosphere
- Bio Flare System
Our scope of this project included the upgrade of the sites power supply. This involved installing a1MVA Transformer, Mains Supply cables, Mains earthing system and installation of a new Main Power Distribution Switchboard, Digestor Motor Control Centre, Generator Connection Panel.
Due to the biogas created by digestor processes, this project involved a considerable amount of equipment being installed in Hazardous Areas. We were responsible for installing this equipment to industry standard for these classified areas, engaging an independent Hazardous Area Electrical Inspector to achieve all the required sign off certifications.
We are proud to be associated with this exciting project. The team at One Electrical get great satisfaction from upgrading and installing plant up to industry standard, working with new technology and having an opportunity to assist in creating a safe and reliable facility.