Fox Lane Sewer Pump Station Replacement, Hamilton City Council

For this project, we were approached by HCC and requested to come with a couple of options to replace the Sewer Pump station including remote monitoring of alarms as the existing station was stand alone.

We presented HCC with some options and it was decided to put the station of the Telemetry network.  We upgraded this station to a full monitored site reporting back to the SCADA in the HCC head office.  We also upgraded the station to Ultrasonic level control with a backup float control.

Some of the hardware used on this site

  • Ultrasonic level sensor
  • Floats
  • Telemetry equipment
  • Allen Bradley PLC